Construction of the first loop of outdoor track. 
The start of the trenching with I just one of many wheel barrel loads of dirt moved that day.
The start of the trenching with I just one of many wheel barrel loads of dirt moved that day.
Viewed: 157 times.

CZ1_3531_DxO.jpg
CZ1_3531_DxO.jpg
Viewed: 137 times.

Line level, used to measure height differences at opposite ends of the loop.
Line level, used to measure height differences at opposite ends of the loop.
Viewed: 145 times.

CZ1_3537_DxO.jpg
CZ1_3537_DxO.jpg
Viewed: 109 times.

CZ1_3540_DxO.jpg
CZ1_3540_DxO.jpg
Viewed: 137 times.

CZ1_3544_DxO.jpg
CZ1_3544_DxO.jpg
Viewed: 121 times.

CZ1_3548_DxO.jpg
CZ1_3548_DxO.jpg
Viewed: 105 times.

Start of the trench for the straight section near the tree.
Start of the trench for the straight section near the tree.
Viewed: 107 times.

CZ1_3552_DxO.jpg
CZ1_3552_DxO.jpg
Viewed: 120 times.

Liner in the trench and a little stone just to help keep is down.  The bricks keep the edges from lifting in the breeze or when walked on.
Liner in the trench and a little stone just to help keep is down. The bricks keep the edges from lifting in the breeze or when walked on.
Viewed: 145 times.

CZ1_3560_DxO.jpg
CZ1_3560_DxO.jpg
Viewed: 149 times.

CZ1_3565_DxO.jpg
CZ1_3565_DxO.jpg
Viewed: 147 times.

Powered by Gallery v1 RSS